Production Jumps 44% on Trumpf 4050 Laser @ Russel Metals
As a result of the technical support P.E.P. provided
1. INCREASE the 4050 one year ROI by $ 300,000.00
2. INCREASE the 4050 five year ROI by $1,500,000.00
3. Generate more business now that production is up by 44% 
The technical support staff boosted the lasers productivity by analyzing the posted code for the error produced when cutting the nest at the right. After diagnosing the problem they explained to the laser programmer and operator the proper posting and pierce sequencing procedures for cutting ½ inch and thicker materials.
The Rest of the Story!
The problem came up at
The error 22 indicates over heating. The error was brought on by the pierce cycle sequence and wattage used to pre-pierce the hole intensive nest with the 4050 laser. The P.E.P. support team had
The ROI savings noted in the top of this document are a result of the technical support
MOST IMPORTANT ASPECTS OF THE CALL:
1) The knowledge of the P.E.P. support staff was the difference in recognizing the long term productivity savings and the need to change their procedures.
2) The P.E.P. support staff took the
3) Most customers do not think they have the time to test whether they are running their lasers as fast as they can, in this situation
Nest Data
Material: ½” mild steel
Plate Dimensions: 80x96
Pierces: 498
Head Raises: 41 (less than 10% )
Total Processing Time / Cost before pre-pierce was turned off: 1 hr. 30 min. @ machine rate = $XXX.
Total Processing Time after pre-piercing was turned off: 50 min. @ machine rate = $xxx.
Measurement Masters, Inc. · One Technology Drive D401 · Irvine, CA 92618
Corporate: (949) 753-7878 Fax: (949) 753-8585 E-mail: Sales@peptechnology.com